| Parameter | Value |
|---|---|
| Reactor State | Power |
| Power | 19.76 MW |
| CNS Mode | Normal Operation |
| Control Rod Position | 34.19 % |
| Last Data Acquisition | 2026-07-29 07:39:27 (Sydney local time) |
Refer to the OPAL Reactor Schedule (https://www.ansto.gov.au/our-facilities/opal-multi-purpose-reactor/opal-operating-cycles) to view the planned power and shutdown days for each operating cycle.