Parameter | Value |
---|---|
Reactor State | Shutdown |
Power | 0.88 MW |
CNS Mode | Halt |
Control Rod Position | 0 % |
Last Data Acquisition | 2024-05-12 23:02:01 (Sydney local time) |
Refer to the OPAL Reactor Schedule (https://www.ansto.gov.au/our-facilities/opal-multi-purpose-reactor/opal-operating-cycles) to view the planned power and shutdown days for each operating cycle.